viewourprojects.jpg guardrailingImage2 pageImage5 guardrailingImage1

Guard Rail Installations

Beeby Construction have imported from Italy the first of three Turchi 260s specialist hydraulic machines to install guardrail with greater reliability, efficiency and superior service. This technology raises on-site productivity so that construction time is shorter and traffic disruption is reduced. Difficult ground conditions present no problem.

Check out the 'On Guard' article on the NZ Contractor website 

Choosing the best system
Look for these benefits:
1. Experienced Construction
2. Full service capability of the system
3. Cost effective
4. Fastest on-site performance
5. Minimum traffic disruption
6. Smaller-footprint, durable steel posts

Specifications
Installation machine Turchi 260s hydraulic.
Posts Steel, providing smaller footprint and
greater durability.

Hole drilling
Machine-powered auger drive and hammer
drilling to full depth through rock and
concrete.

Back filling
Driller materials.

Staffing
All staff are fully trained in the installation of the guardrail, and all
workmanship meets Transit New Zealand standards.

Supporting services
Expert technical advice
System design assistance
System supply and installation
Spare parts
Repair work
Lifting and realignment if required
Associated roading work

Additional service available:
Removal of original barrier or parapet